The public Works Authority 'Ashghal' announced that access and egress to and from Rawdat al Debdeba Street and Al Erbayyat Street will be temporarily closed for about 350 metres.
The remaining sections of Rawdat al Debdeba and Al Erbayyat Streets will remain open in both directions and vehicles will be able to make a detour U-turn that will be in place at the end of both streets (as shown in the attached map). The temporary closure will start on Saturday, 11 July 2015 for a period of two months. The closure is needed to allow for the construction of the road that will in the future connect Al Jazeera Flyover, which is currently under construction, to the Abou Hamour existing road as part of the construction and upgrade of the infrastructure of Al Muntazah Street Extension, including all necessary utilities.
Vehicles wishing to access Rawdat al Debdeba and Al Erbayyat Streets from Mesaimeer road can use the adjacent local streets in the area, namely the Wadi al Ghadeeriyat, Al Slemiya, and Saad Bin Majid streets to get to their destinations as shown in the attached map. Ashghal urges all commuters to abide by the speed limits to help ensure their safety and to follow the new instructions displayed in the area to guide them.
Categories: