The Public Works Authority ‘Ashghal’ is implementing a limited traffic diversion on Al Shamal Road, where 500 metres of the lane adjacent to median, heading north under Izghawa Interchange will be closed.
The traffic diversion, which is implemented in coordination with the General Directorate of Traffic, will take place on 11 May 2017 and lasts for 15 days. The traffic diversion aims to repair and install the treated sewage effluent line in the median, as part of Al Shamal Road Improvement works. The traffic flow on AL SHamal Road will not be affected by this diversion, whereas the remaining three lanes on Al Shamal Road are open to traffic as normal. For their safety, Ashghal requests motorists abide by traffic instructions and the newly installed signage and abide by the speed limits.
Categories: